~~DISCUSSION:off~~ ===== BUILDING THE ENCLOSURE ===== Watch our video titled, [[https://www.youtube.com/watch?v=L2jF7Luz17Q&feature=player_embedded|“M.I.N.E.™ TRAP TRAINING (2)- BUILDING THE ENCLOSURE”]] for detailed information. \\ **NOTE: Video will open in this window.** {{ :wiki:mine_trap:installation:build-enclosure-1.png?nolink&200|}}Drive a 7 foot long T-post measuring 12 feet from the feeder. This will become the left support post for the 8 foot wide MINE gate. Put the gate in position to measure and drive the right support post. Measure 20 feet from the rear of the feeder and drive another 7 foot long post to form a 35 foot triangle. This triangle will begin the outside dimension of the trap enclosure. ---- ---- {{backlinks>.}}