~~DISCUSSION:off~~
Watch our video titled, “M.I.N.E.™ TRAP TRAINING 
(2)- BUILDING THE ENCLOSURE” for detailed information. 
NOTE: Video will open in this window.
 Drive a 7 foot long T-post measuring 
12 feet from the feeder. This will become the left 
support post for the 8 foot wide MINE gate. Put 
the gate in position to measure and drive the right 
support post. Measure 20 feet from the rear of the 
feeder and drive another 7 foot long post to form a 
35 foot triangle. This triangle will begin the outside 
dimension of the trap enclosure.
Drive a 7 foot long T-post measuring 
12 feet from the feeder. This will become the left 
support post for the 8 foot wide MINE gate. Put 
the gate in position to measure and drive the right 
support post. Measure 20 feet from the rear of the 
feeder and drive another 7 foot long post to form a 
35 foot triangle. This triangle will begin the outside 
dimension of the trap enclosure.
.