~~DISCUSSION:off~~ ===== INSTALLING CONTROL BOX ===== |Place the control box onto the frame in \\ this position. |{{:wiki:mine_trap:installation:control_box:control-box-1.png?nolink&200 }} | |Be careful not to pinch the solar panel \\ polarized plug against the frame. |{{:wiki:mine_trap:installation:control_box:control-box-2.png?nolink&200 }} | |Align the slots and gently snap the clevis onto \\ the actuator arm. |{{:wiki:mine_trap:installation:control_box:control-box-3.png?nolink&200 }} | |Secure the rod adapter with pliers. Turn \\ the set screw with a 3/32 Allen wrench to \\ break the Loctite seal at threads. |{{:wiki:mine_trap:installation:control_box:control-box-4.png?nolink&200 }} | |Ensure the control box is tight against the \\ trigger assembly. Using a 3/8” nut driver \\ and drill, secure the control box to the \\ frame with four #14 self tapping, 3/4” long \\ screws. |{{:wiki:mine_trap:installation:control_box:control-box-5.png?nolink&200 }} | ---- ---- {{backlinks>.}}