User Tools

Site Tools


Sidebar

Southern Hog Control
Main Web Site


Follow us on: Facebook, Twitter, and YouTube


Information - Dokuwiki


wiki:mine_trap:installation:building_enclosure

~~DISCUSSION:off~~

BUILDING THE ENCLOSURE

Watch our video titled, “M.I.N.E.™ TRAP TRAINING (2)- BUILDING THE ENCLOSURE” for detailed information.
NOTE: Video will open in this window.

Drive a 7 foot long T-post measuring 12 feet from the feeder. This will become the left support post for the 8 foot wide MINE gate. Put the gate in position to measure and drive the right support post. Measure 20 feet from the rear of the feeder and drive another 7 foot long post to form a 35 foot triangle. This triangle will begin the outside dimension of the trap enclosure.



.

wiki/mine_trap/installation/building_enclosure.txt · Last modified: 2021/12/15 12:07 (external edit)