+ | ===== BUILDING THE ENCLOSURE ===== | ||
+ | Watch our video titled, [[https:// | ||
+ | (2)- BUILDING THE ENCLOSURE”]] for detailed information. \\ **NOTE: Video will open in this window.** | ||
+ | |||
+ | {{ : | ||
+ | 12 feet from the feeder. This will become the left | ||
+ | support post for the 8 foot wide MINE gate. Put | ||
+ | the gate in position to measure and drive the right | ||
+ | support post. Measure 20 feet from the rear of the | ||
+ | feeder and drive another 7 foot long post to form a | ||
+ | 35 foot triangle. This triangle will begin the outside | ||
+ | dimension of the trap enclosure. | ||
+ | |||
+ | ---- | ||
+ | ---- | ||
+ | |||