User Tools

Site Tools


wiki:mine_trap:installation:control_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

wiki:mine_trap:installation:control_box [2015/05/25 08:56]
wiki:mine_trap:installation:control_box [2021/12/15 12:07] (current)
Line 1: Line 1:
 +~~DISCUSSION:off~~
  
 +===== INSTALLING CONTROL BOX =====
 +
 +|Place the control box onto the frame in \\ this position. |{{:wiki:mine_trap:installation:control_box:control-box-1.png?nolink&200  }} |
 +|Be careful not to pinch the solar panel \\ polarized plug against the frame. |{{:wiki:mine_trap:installation:control_box:control-box-2.png?nolink&200  }} |
 +|Align the slots and gently snap the clevis onto \\ the actuator arm. |{{:wiki:mine_trap:installation:control_box:control-box-3.png?nolink&200  }} |
 +|Secure the rod adapter with pliers. Turn \\ the set screw with a 3/32 Allen wrench to \\ break the Loctite seal at threads. |{{:wiki:mine_trap:installation:control_box:control-box-4.png?nolink&200  }} |
 +|Ensure the control box is tight against the \\ trigger assembly. Using a 3/8” nut driver \\ and drill, secure the control box to the \\ frame with four #14 self tapping, 3/4” long \\ screws. |{{:wiki:mine_trap:installation:control_box:control-box-5.png?nolink&200  }} |
 +
 +----
 +----
 +
 +{{backlinks>.}}